we supply chromed bar and tubes for hydualic and pheumatic cylinders. Our merchandise are utilized in many fields. We will supply very best companies and high good quality products with all sincerity.
RV series Traits
- RV – Sizes:030-040-050-063-075-105-110-130-150
- Input Possibilities: with input shaft, With Sq. flange,With Input Flange
- Enter EPT .06 to 11 kW
- RV-Dimensions from 030 to one zero five in die-cast aluminium alloy budy and over a hundred and ten in forged iron
- Ratios in between 5 and a hundred
- Max torque 1550 N.m and admissible output radial loads max 8771 N
- Aluminium models are supplied total with artificial oil and enable for EPT mounting positions, with no need to modify lubricant amount
- Worm wheel: Copper (KK Cu).
- Loading capability in accordance with: ISO 9001:2015/GB/T 19001-2016
- Size 030 and above are painted with RAL 5571 blue
- Worm EPT EPTs are obtainable with diffferent combos: NMRV NMRV, NMRVEPT NMRV, JWB NMRV
- NMRV, NRV VS,NMRV AS,NMRV VS,NMRV F
- Alternatives: torque arm, output flange, viton oil seals, low/higher temperature oil, filling/drain/breather/level plug,Little hole
Basic types can be applied to a vast selection of EPT reduction ratios from 5 to 1000.
Guarantee: One particular 12 months from day of delivery.
WORM EPT | |||||
SNW Sequence | Output Pace Selection: | ||||
Type | Previous Sort | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
SNW030 | RV030 | 21N.m | phi14 | Relevant EPT EPT: | |
SNW040 | RV040 | 45N.m | phi19 | .06kW-11kW | |
SNW050 | RV050 | 84N.m | phi25 | Enter Options1: | |
SNW063 | RV063 | 160N.m | phi25 | With Inline AC EPT | |
SNW075 | RV075 | 230N.m | phi28 | Enter Options2: | |
SNW090 | RV090 | 410N.m | phi35 | With Sq. flange | |
SNW105 | RV105 | 630N.m | phi42 | Enter Options3: | |
SNW110 | RV110 | 725N.m | phi42 | With Enter Shaft | |
SNW130 | RV130 | 1050N.m | phi45 | Input Options4: | |
SNW150 | RV150 | 1550N.m | phi50 | With Input Flange |
EPT Travel
ZheJiang EPT Generate Co.,Ltd,the predecessor was a state-owned navy mould EPTrprise, was estabEPTd in 1965. EPT EPTizes in the complete EPT EPT solution for higher-stop gear manufacturing EPT based on the intention of quotPlatform Product, Software Design and style and Professional Services quot.
EPT have a sturdy specialized drive with over 350 employees at present, incXiHu (West Lake) Dis.Hu (West Lake) Dis. more than 30 engineering technicians, thirty quality inspectors, masking an region of 80000 square meters and types of EPT processing EPTs and screening equipments. We have a very good foundation for the business application deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment and service of large-conclude pace EPTs amp variators owning to the provincial engineering EPT study cEPTr,the lab of EPT velocity EPTs, and the foundation of modern day R ampD.
Our Group
EPT Handle
EPT:Insist on EPTrovement,Attempt for Excellence With the deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment of products production indurstry,buyer by no means satirsfy with the present top quality of our products,on the contrary,wEPT the benefit of top quality.
EPT plan:to improve the all round stage in the subject of EPT EPT
EPT See:Steady EPTrovement , pursuit of excellence
EPT Philosophy:EPT EPTs price
3. Incoming EPT Management
To build the AQL appropriate degree of incoming materials management, to give the content for the EPT inspection, sampling, immunity. On the acceptance of experienced merchandise to warehousing, substXiHu (West Lake) Dis.Hu (West Lake) Dis.rd merchandise to get return, examine, rework, rework inspection dependable for tracking bad, to keep track of the provider to get corrective actions
to avoid recurrence.
4. Approach EPT Manage
The producing site of the very first assessment, inspection and ultimate inspection, sampling according to the specifications of some projects, judging the high quality modify pattern
located irregular phenomenon of manufacturing, and supervise the generation division to enhance, get rid of the irregular phenomenon or point out.
5. FQC(Final QC)
Right after the manufacturing department will comprehensive the solution, stand in the customer’s place on the concluded solution good quality verification, in buy to ensure the top quality of
buyer expectations and wants.
six. OQC(Outgoing QC)
After the product sample inspection to deterEPT the competent, enabling storage, but when the concluded product from the warehouse ahead of the official shipping and delivery of the merchandise, there is a check out, this is called the shipment inspection.Check out content:In the warehouse storage and transfer status to verify, whilst confirming the shipping of the merchandise
is a item inspection to deterEPT the experienced merchandise.
EPT
Delivery